Norochcholai Power Plant : Breakdown update

November 17, 2023 at 9:52 PM

The Norochcholai Coal Power Plant’s second generator unit is undergoing deactivation due to a malfunction in its High Pressure Heater System.

Fortunately, power supply will remain uninterrupted as hydropower will be generated at maximum capacity during the repair period.

Additionally, the third generator unit is nearing operational readiness.